Our work (please click on each picture to enlarge)
200Amp panel in mountain view. Stucco repair by Orlando Martinez.
Receptacles are all at exactly at the same height.
Pass & Seymour devices
Hazardous commercial facility in Milpitas. Installed (2) 30Amp circuit for forklift chargers.
Panel is covered with Fire Pads because the wall is fire rated wall facing the garage.
Addition in Sunnyvale.
Vehicle stuck in a ditch in Morgan Hill mountains. Drive time 45 minutes to Morgan Hill, got stuck for 1 hour, small repair took 15 minutes, 45 minutes drive back to office.
ZINSCO fire hazard panel to be replaced with 200Amp rated SQUARE-D panel. In Los Altos.
With existing conduit at the bottom. Installed new 200Amp main panel, 200Amp subpanel & manual transfer switch.
Building a structure with 4″x4″ pressure treated posts to be set in 24″ of concrete and 2″x8″ lumber to support new panels.
Had a temporary generator utill the power got restored next day.
Panel was on fire because Mr. Jingles was living here.
Sunnyvale panel upgrade with whole house surge protector. Both units are by SQUARE-D
Special ceiling box for cathedral ceiling.
200Amp panel upgrade. Stucco paper to be repaire, caulked and made water tight before stucco repair
Old 100Amp panel to be replaced with a 200Amp SQUARE-D panel
Installed new housing from Redwood with a new 100Amp SQUARE-D panel
Old panel in Palo Alto to be replaced with a 100Amp SQUARE-D